The DEWA (Dubai Electricity and Water Authority)

The DEWA (Dubai Electricity and Water Authority) Application for Completion Certificate and As-Built Approval is a critical process in the final stages of a construction project in Dubai. This procedure ensures that all electrical and water systems have been installed according to DEWA’s regulations and standards, and that the project is ready for final approval and connection to the utility grid.

Steps to Apply for Completion Certificate and As-Built Approval:

  1. Preparation of As-Built Drawings:
    • Compile accurate as-built drawings that reflect the completed construction, showing all electrical and water installations as constructed. These drawings must be detailed and include all necessary schematics and layouts per DEWA requirements.
  2. Submission of Documents:
    • Submit the as-built drawings and the DEWA application form for the completion certificate. The submission should include all relevant documents, such as inspection reports, compliance certificates, and any previous DEWA approvals obtained during the project.
    • Ensure that all documents are prepared according to DEWA’s guidelines to avoid delays in the approval process.
  3. DEWA Inspection:
    • After submission, DEWA will conduct a site inspection to verify that the installation of electrical and water systems matches the submitted as-built drawings and complies with their standards.
    • Any discrepancies or issues identified during the inspection must be addressed and rectified before proceeding to the next step.
  4. Approval and Issuance of Completion Certificate:
    • Once DEWA is satisfied with the inspection results and the documentation, it will issue the completion certificate, which will signify that the project meets all regulatory requirements and is ready for utility connection.
    • This certificate is essential for the project’s final commissioning and obtaining other necessary occupancy permits.
  5. Final Connection to Utilities:
    • After receiving the completion certificate, DEWA will proceed with the final connection of the electrical and water services to the project, making it fully operational.

Required Documents:

  • Completed DEWA application form.
  • As-built drawings.
  • Compliance certificates (for electrical and plumbing systems).
  • Inspection reports and test results.
  • Any previous approvals or permits issued by DEWA during the construction phase.

Tips for a Smooth Approval Process:

  • Ensure all as-built drawings and documents are accurate and up-to-date.
  • Address any issues identified in preliminary inspections before the final DEWA inspection.
  • Maintain clear communication with DEWA throughout the process to ensure all requirements are met.

By following these steps and ensuring that all documentation is in order, the process of obtaining DEWA’s completion certificate and as-built approval can be completed efficiently, paving the way for the successful finalization of your construction project.